EcoFlow home battery on a villa wall next to the family pool
Launching soon in the UAE

Solar that keeps the AC running after sunset.

Three-phase EcoFlow home batteries and hybrid inverters from 10 to 29.9 kW, sized for Gulf villas and supplied by UniteGreen as technical wholesaler. Installers who register now are first in line.

EcoFlow 2026 Authorised Dealer

EcoFlow Authorised Dealer 2026

Built for Gulf loads

Three-phase only. 10 kW and up.

Air-conditioning drives villa demand in the UAE. Smaller systems cannot carry those loads, so we supply three-phase systems from 10 kW that match how Gulf homes actually use power.

EcoFlow OCEAN 2 three-phase home battery

Three-phase · new generation

EcoFlow OCEAN 2

All-in-one hybrid inverter and battery for smaller villa projects.

  • 10 kW
  • 12 kW
  • 15 kW
EcoFlow PowerOcean inverters and battery stacks against a sand-coloured wall

Three-phase · mid to large

EcoFlow PowerOcean Plus

For larger villas, compounds and small commercial sites.

  • 15 kW
  • 20 kW
  • 25 kW
  • 29.9 kW
EcoFlow EcoFlow batteries · 5 kWh & 8 kWh

Storage

EcoFlow batteries · 5 kWh & 8 kWh

Modular and expandable. Battery generations are compatible with each other, so systems grow with the household.

EcoFlow PowerInsight

Energy management

PowerInsight

All energy data on one display, plus smart-home control. A strong selling point with premium clients.

EcoFlow PowerPulse 2 Wallbox

EV charging

PowerPulse 2 Wallbox

Charges the EV with the home's own solar power. An add-on sale in every project with an electric car.

Family relaxing at home in the evening, EcoFlow battery on the wall outside

Store the midday sun, run the evening on it and keep the house powered through outages.

Solar installers

Add storage to your villa PV offers and lift project value.

EPCs

Standardised three-phase storage for residential and light commercial portfolios.

Developers

Specify storage for new villa communities across the UAE and GCC.

How pre-registration works

  1. Step 1

    Register

    Share your company profile and typical project size.

  2. Step 2

    Technical onboarding

    Datasheets, system design support and product training ahead of launch.

  3. Step 3

    First allocation

    Registered partners are served first when stock lands in the UAE.

Reserve your launch allocation

Tell us about your projects. We will contact you with technical documentation and launch timing.